Disposal Plants
WASTEWATER DEPARTMENT
MAILING ADDRESS: Public Works
529 Glover Avenue
Enterprise, AL 36330
PHONE NUMBER: (334)348-2661
FAX NUMBER: (334)308-2495
|
In Recognition of outstanding operation achieved by the operators of this plant |
for Three Consecutive Years. |
Best Operated Plant Award For Lagoon 300,000 Million Gallons or Greater Aerated 2001, 2002 and 2003 |
|
AWPCA Best Operated Plant Presented to Southeast Lagoon, City of Enterprise. In Recognition of outstanding operation achieved by the operators of this plant for 2001, 2002 & 2003 |
The City of Enterprise maintains 2 Lagoon Systems, 1 mechanically operated treatment plant and 13 Lift Stations throughout the surrounding City.
|
The following wastewater locations provided below lists the gallons of wastewater treated per day at each location. |
Southeast Lagoon,
Coppinville Road |
Average per day .530 Million Gallons
|
|
Maximum 1.1 Million Gallons
|
Northeast Lagoon,
Porter Lunsford Road |
Average per day 1.052 Million Gallons
|
|
Maximum 1.1 Million Gallons
|
Enterprise College Street Wastewater Treatment Plant,
College Street Extension (Pistol Road) |
Average per day 1.087 Million Gallons
Maximum 1.5 Million Gallons
|
|